Steel Mezzanine Fabricated and Installed in Nine Days

Installed in Nine Days

The client had already been quoted fourteen weeks by two suppliers. Their lease renewal was in six.

Two hundred and forty square metres of mezzanine, rated for palletised storage, inside a working warehouse that could not stop trading. The constraint was not the steel — it was doing the work around a live picking operation.

How we approached it

  • Surveyed on a Sunday when the floor was clear, so measurements were taken once and taken right.
  • Fabricated the frame off site while the structural sign-off was still in progress.
  • Installed in three phases, each confined to one aisle, so picking continued in the rest of the building.
  • Delivered load certification and drawings on handover, not three weeks later.

Result

Nine working days on site. The client added 240 m² of usable floor for roughly a fifth of the cost of relocating, and signed a lease renewal instead of a removal contract.

Working to a deadline someone else set? 

Tell us the date first 

— it changes the whole plan.